Case Study 3
.............................
Portavadie Marina, Loch Fyne
Main and Sub Main Electrical Switchboards
Given a very short lead time, this
project had to be designed, built
and delivered within 4 weeks from
ordering.
We also had to design the panels
to suit a switch room that had
very limited headroom.